Using pumping-test results to choose equipment

This guide supports water pumping tests projects in Kenya. Use it to prepare the information needed for a site-specific discussion and to compare proposed work on a consistent basis.

Keep the system and its records useful

Retain raw readings as well as the report. The pump installer needs the recommended discharge and expected pumping water level, not only a headline litres-per-hour figure.

The information to collect

Measure how a borehole performs under controlled pumping before selecting permanent equipment. Test pumping provides evidence about discharge, drawdown and recovery so the operating plan can reflect the source.

  • Pre-test water-level measurement and equipment setup
  • Step and constant-rate testing as appropriate to the agreed method
  • Discharge, water-level, time and recovery records
  • Interpretation and operating recommendations by the responsible specialist

A practical review process

First, name the intended outcome and the person responsible for approving the design or scope. Gather the existing site records and mark anything that is an estimate. Ask the provider to explain which missing measurements could change the recommended equipment or work.

Next, compare the proposed deliverables with the actual requirement. Keep the quotation, specification and acceptance criteria together. If the design changes after assessment or testing, record what changed and approve the revised scope before proceeding.

Avoid a misleading comparison

An airlift observation or a brief water strike is not a substitute for an interpreted pumping test. Recommendations depend on test conditions, measurement quality and the purpose of the borehole.

Pump capacity, mobilisation, fuel or electricity, monitoring duration, water disposal and report preparation determine the testing scope. Confirm what test stages and report are included.

Check the result at handover

Retain raw readings as well as the report. The pump installer needs the recommended discharge and expected pumping water level, not only a headline litres-per-hour figure.

Adapt the brief to your site and audience

A household may prioritise simple operation and reserve supply. A school or NGO may need operator training, beneficiary or occupancy information and procurement records. A farm needs its irrigation or livestock demand defined. A diaspora-funded project also needs clear local access and remote approval responsibilities.

Continue with water pumping tests, county planning guidance and a project enquiry.

Does this guide replace a site assessment?

No. It is a planning checklist. Final engineering, water-use decisions and equipment selection depend on measured conditions and the responsible professionals’ assessment.

What should I send when requesting a quote?

Start with your Kenyan site location, intended use and existing records. For this service, prioritise borehole depth, diameter and construction information and safe measurement access and known pump setting depth.

A better system starts with your site.

Tell us your county, intended water or energy use, and project stage. We will help you define the assessment and scope.