Borehole approvals · Kenya
Plan it right.
Drill with
confidence.
Your guide to WRA borehole requirements in Kenya. Get your documents in order, understand the approvals and know what to ask before the rig arrives.
For homes, farms, institutions & community projects.
Good water.
Proper paperwork.
- Know your site & water demand
- Prepare the survey & approvals
- Keep construction & testing records
- Confirm permission to use the water
A survey is not permission to drill. Authorisation to construct is also different from permission to abstract water. Plan for both stages of the WRA process.
01 / Understand the sequence
Three stages.
No skipped steps.
Looking for “WRMA” or “WARMA” requirements? The current regulator is the Water Resources Authority (WRA). Start with the approval route for your particular site and proposed use.
WRA determines the application category. Environmental and county requirements must also be checked for your project.
Prepare & apply.
Establish the site, demand and applicant details. Prepare the hydrogeological report and submit the WRA application. Confirm the separate environmental assessment route with a licensed expert.
OUTPUT: A COMPLETE APPLICATIONAuthorise & drill.
Wait for the relevant approvals, then build within their conditions. Agree who supervises the work and collects the drilling, construction and testing records.
OUTPUT: DOCUMENTED FIELDWORKComplete & operate.
Submit completion evidence, water-quality results and the required fees. Arrange WRA inspection where required and obtain the applicable water-use permission before abstraction.
OUTPUT: AN AUTHORISED WATER USE02 / Build your project file
The paperwork.
Made practical.
Use this 12-point preparation checklist with your hydrogeologist, drilling contractor and project representative.
It combines regulatory steps with useful project records. Your WRA office and environmental expert should confirm the exact submission requirements.
Ticks apply to this visit. Completing this list does not constitute an approval.
Before you apply
Before the rig arrives
Before routine water use
Keep one shared project folder. If you are funding the project from abroad, name a local representative and request dated copies of reports, receipts and site records at each milestone.
Discuss my checklist03 / Know what you are paying for
A clear budget.
Fewer surprises.
Ask for separate line items. A single “permit fee” can hide professional work, regulatory charges and field costs that should be easy to compare.
Explore the borehole cost guide →- 01Survey & technical reportingDefine site visits, investigation, the report and any additional work requested during review.
- 02Environmental assessmentSeparate the expert’s professional fee from official NEMA charges and any additional studies required.
- 03WRA chargesUse the applicable official fee schedule and WRA invoice for your category. Keep application, verification and permit charges identifiable.
- 04Construction, testing & completionInclude mobilisation, drilling, casing, development, test pumping, laboratory analysis and completion documentation.
- 05Operation & ongoing obligationsPlan for pumping energy, maintenance, monitoring and applicable water-use or renewal charges.
04 / Keep the project in good order
The file stays open
after handover.
Make the records useful to the person actually operating the system. A good handover connects the approval conditions to everyday decisions.
Read the maintenance guide →- Know the operating limits
Keep the permitted use and abstraction conditions with the pump controls and operating instructions.
- Record performance
Keep meter readings, maintenance notes and water-quality reports accessible. Investigate changes in yield, water appearance or equipment behaviour.
- Protect the source
Maintain the wellhead and manage drainage, chemicals, fuel and sanitation around the site.
- Check before changing the project
Ask WRA about the approval implications of changing ownership, water use, abstraction or the works. Diary the dates stated on your documents.
05 / Questions worth asking
Before you commit.
Clear answers for the conversations between you, your project team and the relevant authorities.
Are WRA, WRMA and WARMA the same thing?
WRA is the current Water Resources Authority. WRMA refers to its predecessor, the Water Resources Management Authority. “WARMA” is a common search spelling. Use the current WRA name when checking forms and official correspondence.
Can I drill once I have paid for a survey?
No. The survey supports the technical assessment and application. Obtain the applicable written authorisation and other required approvals before fieldwork. WRA explains the distinction between construction authorisation and the water permit.
Does every borehole follow the same approval route?
No. WRA categorises applications, and site conditions and intended use matter. Do not assume a domestic, farm, institutional or commercial project has identical requirements. Selling or supplying water to other users can also raise separate water-service requirements; discuss these with the county and relevant water-service bodies.
Is a NEMA approval included in the WRA authorisation?
Treat environmental approval as a separate matter. Ask a licensed environmental expert to confirm the applicable assessment and submission route with NEMA. A consultant’s report alone is not the same as an issued approval. Confirm the current route with NEMA.
How much will approvals cost, and how long will they take?
The total depends on the category, professional scope, official charges and any additional work requested. Ask for an itemised estimate and a timeline that separates preparation, authority review and fieldwork. We do not promise a fixed approval date or a universal permit price.
Is there a universal 500-metre borehole spacing rule?
Do not treat 500 metres as a blanket siting approval or prohibition. Regulation 53 allows WRA to request tests concerning an existing borehole within that distance; aquifer allocation plans also govern spacing. Have the hydrogeologist check the local context. Read regulation 53.
Your site. Your next step.
Let’s get your
project started right.
Tell us where you plan to drill and what the water needs to do. We’ll discuss the survey, project scope and the documents to prepare.
- Your county, town or site location
- How you intend to use the water
- Any survey or approval you already have