Pump and water systems for Nairobi properties

Coordinate tanks, distribution pressure, phased occupancy and common-equipment management with the property design.

Make the brief specific to the project

For a site in Nairobi County, supply the actual location and access route rather than only the nearest town. For built-up properties, verify access, available rig space and existing underground or overhead services. Our listed business address is in Kamulu, Njiru sub-county.

For developed or subdivided sites, coordinate access, construction space, tanks and existing services before mobilisation. Confirm ownership and any shared-use arrangements. Neighbouring borehole performance is useful background, not a guarantee for your plot.

The technical scope

Select and install a pump that matches the tested borehole and the delivery point. A reliable system needs the right duty point, cable, rising main, controls and protection, as well as the pump itself.

Total dynamic head combines lift from the pumping water level, the elevation of the delivery point, pipeline friction and any required discharge pressure. Compare that duty with the pump curve and motor loading limits.

  • Borehole completion and pumping-test records
  • Static and pumping water levels with sustainable operating recommendations
  • Tank elevation, pipeline length and desired delivery pressure
  • Available grid, solar or generator power and daily operating hours

Project governance and change control

Identify the owner, scope approver, access contact and eventual operator. Use one version of the quotation and agree the evidence needed at assessment, construction, equipment selection and commissioning. Explain how a changed site finding will be approved before further cost is incurred.

What should be in the quotation?

The pump model, installation depth, cable length, pipe class, control panel, protection equipment, lifting requirements and commissioning scope affect the total.

Horsepower alone does not establish suitability. Oversizing can increase cost or draw the source down too far; undersizing can leave a full tank unreachable. A deeper borehole does not automatically mean the pump should sit at the bottom.

Acceptance and aftercare

Keep model and serial numbers, the selected duty point, pump setting depth, control settings, measured flow, current readings, warranties and an isolation procedure.

Agree who will monitor the system, how maintenance is funded and where the records will be stored. Include operator training and a clear contact for abnormal readings, low flow or equipment faults.

Continue planning

A better system starts with your site.

Tell us your county, intended water or energy use, and project stage. We will help you define the assessment and scope.