Build a groundwater source around survey evidence, intended demand and a documented construction plan. Our drilling service covers the route from mobilisation and construction to development and a tested handover.
Start with a clear site brief
Ask the contractor to identify what is measured during drilling, how water strikes and formations are recorded, and who signs off the final borehole construction. The completion design should follow the actual ground conditions.
- Survey report and the current project approvals
- A site access plan including gate width, turning space and working area
- Intended domestic, irrigation, institutional or industrial demand
- Agreement on target depth, scope exclusions and change approval
What the service can include
The final quotation should identify the work included, the documents supplied and the responsibilities that remain with the owner. We develop the scope from your site information and assessment findings rather than assuming one package suits every project.
- Rig mobilisation and site preparation within the agreed scope
- Drilling records, formation logging and construction decisions
- Casing, screens, gravel pack and sanitary completion to design
- Development followed by pumping tests and water sampling
What determines the cost?
Separate survey, approvals, mobilisation, drilling, casing, development, test pumping, laboratory testing, pump equipment, power, storage and distribution. Record how extra depth or changes will be approved.
Compare quotations on the same basis. Ask whether mobilisation, materials, testing, taxes, commissioning and aftercare are included. Where the work depends on findings that are not yet available, agree how the price or design will be updated before the next stage.
What to check before committing
A per-metre price is only one part of the project. Drilling depth, formation stability and water quality vary by site. Neither an online county guide nor a nearby borehole can guarantee the result on your land.
A useful handover
Request the borehole location, construction log, casing and screen schedule, pumping-test interpretation, water analysis and operating recommendations.
Nominate the person who will operate or maintain the system and make sure they can explain the normal operating sequence, when to isolate equipment and who to contact if readings or performance change.
For your property or organisation
We plan projects for homes, farms, NGOs, schools, public institutions and businesses. Kenyans living abroad can nominate a local representative and agree documented approvals before work starts. The site remains in Kenya; your residence country helps us coordinate communication.
Find your county planning page or choose the guide for your organisation.
Questions to ask
Can you quote before visiting the site?
We can discuss an initial scope from your records and objectives. A firm installation or construction scope may require an assessment and the missing technical information. Any initial estimate should state its assumptions.
Which county do you cover?
Send the project county, nearest town and site pin. We confirm access, mobilisation and the practical delivery arrangement for the requested work before accepting the scope.
Can a Kenyan abroad coordinate the project?
Yes. Agree one authorised decision maker, a local access contact and the evidence needed for each milestone. State your residence country and time zone on the enquiry form.