DAB 2NKVE 32/3 T MCE 400-50 Twin Booster Set

DAB 2NKVE 32/3 T MCE 400-50 Twin Booster Set

DAB 2 NKVE product-family reference. The listing specifies the 32/3 T MCE 400-50 twin set.

Pressure-Boosting Systems · Kenya

One DAB 2NKVE 32/3 T MCE 400-50 factory twin booster set, reference 60166810. The duty point, three-phase supply and installation must be checked against the exact pump curve. External site pipework and installation are separate.

Price and ordering

KSh 2,750,000

What this price includes

One DAB 2NKVE 32/3 T MCE 400-50 factory twin booster set, reference 60166810. The duty point, three-phase supply and installation must be checked against the exact pump curve. External site pipework and installation are separate.

Delivery to your county, installation and any extras listed above are charged separately. Confirm equipment compatibility and dispatch timing with our team before payment.

Add to cart

View cart Ask about this equipment on WhatsApp

Choosing this equipment

Specify the required duty point and whether the second pump provides standby, assistance at peak demand, or both. No universal flow or head is assigned to this listing.

  • Provide building height, number of outlets, expected simultaneous use and the position of the source tank. Describe current low-pressure or intermittent-supply problems.
  • Request a pump duty calculation for flow and pressure, rather than selection solely by horsepower. Check pipe sizes, pressure limits and the available electrical supply.
  • For a multi-pump set, agree the duty/standby arrangement, controls, maintenance isolation and what happens when the source tank is low.

Before delivery and installation

  1. Agree foundation or mounting, access, pipe supports and isolation before delivery. The supplier should identify any changes needed to existing distribution pipework.
  2. Use the installer to set and commission the system against the agreed building demand. Test the intended protective functions without defeating them.
  3. Record the commissioned settings, pump models and maintenance procedure. Ensure the caretaker knows how to report faults and isolate the system as instructed.

Operation and maintenance

  • Inspect for leaks, unusual cycling and changes in pressure. Arrange diagnosis rather than repeatedly resetting a recurring alarm.
  • Service pumps and associated pressure equipment according to the selected equipment instructions. Reassess the design when the building adds outlets or occupancy.

What to include in your enquiry

Send your county and nearest town, project type, photographs of the installation area and the relevant existing-equipment labels. Tell us the quantity needed, desired timing and which parts of the project you want supplied, installed or serviced. If you are organising the project from abroad, identify the local contact who can provide site access and receive the equipment.

Frequently asked questions

Will a booster increase the borehole’s sustainable yield?

No. It distributes available water at the required pressure. The source, storage and building demand must still be balanced.

Can you quote related equipment together?

Yes. Request a coordinated equipment schedule so the selected components can be checked together. Related listings below are planning options, not a guarantee that every combination is compatible.

Related equipment to discuss

Explore pressure-boosting systems · Borehole and water services · Discuss your site

Market price references

Kenyan supplier listings checked on 7 September 2026 informed this selling price. Supplier stock and dispatch arrangements are separate from ours. Kenyan listed price includes VAT. Benchmark supplier lists this model out of stock; sourcing lead time must be confirmed.

Use the exact supplied model’s current manual and qualified installation support.