Dayliff DN20 R100 Split Prepaid Water Meter

Dayliff DN20 R100 Split Prepaid Water Meter

Dayliff DN20 R100 split meter product reference.

Prepaid Water Metering · Kenya

One Dayliff DN20 R100 plastic dry split prepaid meter. Confirm the required customer-interface unit with your existing system; platform integration, gateways, subscriptions and installation are separate.

Price and ordering

KSh 16,820

What this price includes

One Dayliff DN20 R100 plastic dry split prepaid meter. Confirm the required customer-interface unit with your existing system; platform integration, gateways, subscriptions and installation are separate.

Delivery to your county, installation and any extras listed above are charged separately. Confirm equipment compatibility and dispatch timing with our team before payment.

Add to cart

View cart Ask about this equipment on WhatsApp

Choosing this equipment

Confirm whether DN20 is suitable for the connection’s operating flow and pressure; pipe thread size alone is not a complete meter specification.

  • Provide the number of connections, pipe sizes, expected flow and operating pressure. Identify whether this is a new estate or a retrofit with occupied units.
  • Ask the supplier to demonstrate the exact payment and token workflow. Confirm software ownership, account administration, connectivity needs and any transaction or subscription charges.
  • Agree meter certification requirements, data access, tamper handling, customer support and the maintenance plan before choosing hardware.

Before delivery and installation

  1. Have a competent installer assess plumbing access and plan any supply interruptions with the property manager. Match meter installation requirements to the chosen model.
  2. Commission meters and the payment platform together. Test allocation to the correct connection, credit handling and the agreed fault-recovery process.
  3. Receive an asset register, administrator handover and user instructions. Agree tariffs, billing responsibilities and complaints handling through the appropriate project process.

Operation and maintenance

  • Keep the meter register and service records current. Investigate consumption anomalies before assuming a tenant or meter is responsible.
  • Use the supplier’s support procedure for battery, valve, token or communications faults. Do not bypass or dismantle metering equipment to clear an alarm.

What to include in your enquiry

Send your county and nearest town, project type, photographs of the installation area and the relevant existing-equipment labels. Tell us the quantity needed, desired timing and which parts of the project you want supplied, installed or serviced. If you are organising the project from abroad, identify the local contact who can provide site access and receive the equipment.

Frequently asked questions

Does the meter purchase price include M-Pesa integration?

Not necessarily. Hardware, platform setup, payment charges and ongoing support must all be identified in the quotation.

Can you quote related equipment together?

Yes. Request a coordinated equipment schedule so the selected components can be checked together. Related listings below are planning options, not a guarantee that every combination is compatible.

Related equipment to discuss

Explore prepaid water metering · Borehole and water services · Discuss your site

Market price references

Kenyan supplier listings checked on 7 September 2026 informed this selling price. Supplier stock and dispatch arrangements are separate from ours.

Use the exact supplied model’s current manual and qualified installation support.